SECTION 4: UI/UX DESIGN SYSTEM

ConnectHub SIMS Design System

Unified brand identity: Logo Assets, Standard Color Palette, and Plus Jakarta Sans Typography

1. ConnectHub Logo Identity

Official brand assets stored in public/images/, optimized for both light and dark modes:

ConnectHub Horizontal Logo
Horizontal Logo (Navbar) ../images/logonavbar.png
SIMS Crest Logo
SIMS Crest (Spinner / Brand) ../images/logosims.png
SIMS Circular Logo
Circular Badge (Avatar) ../images/logosims_circular.png
Logo on Dark
Dark Mode Presentation For Conference Room Header / Dark View

2. Brand Color Palette

Harmonious enterprise palette based on Emerald Green (`#044E27`) and Warm Amber (`#FAA31B`):

A. Primary & Accent Colors

Primary Emerald
#044E27
Primary Hover
#033A1D
Primary Tint
#ECFDF5
Secondary Amber
#FAA31B
Amber Hover
#D97706
Amber Tint
#FFFBEB

B. Semantic Status Colors

Success
#10B981
Warning
#F59E0B
Danger / Error
#EF4444
Information
#3B82F6

3. Typography (Plus Jakarta Sans)

Modern, clean, legible geometric typeface optimized for high-density web interfaces:

H1 — 2.25rem (36px) / Bold 800

ConnectHub Real-Time Conferencing & Smart Booking

H2 — 1.5rem (24px) / SemiBold 600

Host Availability & Automated Calendar Slots

Body Regular — 1rem (16px) / Regular 400

ConnectHub provides reliable real-time WebRTC media infrastructure combined with automated calendar scheduling to eliminate scheduling conflicts.

Caption — 0.875rem (14px) / Slate 500

System Timezone: Asia/Ho_Chi_Minh (GMT+7) — Automatically synchronized with ISO 8601 UTC standards.

4. Standard UI Components (.ch-*)

Reusable component tokens across all core screens:

Button Variants

Component 1

Form Controls

Component 2
Displayed on participant tile
Confirmation link dispatched here

Badges & Alerts

Component 3
Online Confirmed Pending Cancelled Sprint 1
Booking Confirmed! A confirmation email with the ConnectHub room link has been dispatched to your inbox.
Host Protected: This session requires Host authorization before admitting participants.

5. Design Process: Wireframe → Mockup Approved Before Dev

Governance Enforced

Enforcing design integrity and preventing visual drift: every screen follows an explicit 4-stage pipeline where low-fidelity wireframes and high-fidelity mockups receive formal Tech Lead approval prior to developer implementation.

1

Lo-Fi Wireframing

Structural blueprints defining information architecture, layout grids, slot selection interaction skeletons, and user journeys across Desktop, Tablet, and Mobile.

Deliverable: Wireframes
2

Hi-Fi Mockup

Applying the ConnectHub SIMS Design System tokens (Emerald #044E27, Amber #FAA31B, Plus Jakarta Sans typography) with responsive micro-states.

Deliverable: Mockups
3

Review & Approval Gate

Mandatory sign-off checkpoint by Tech Lead & Product Owner. Verified against WCAG 2.1 AA accessibility contrast, zero double-booking UX integrity, and brand rules.

Sign-off Required
4

Dev Implementation

Developers implement zero-drift frontend using sims-tokens.css and sims-components.css. REST API binding and automated visual regression testing.

Deliverable: Production UI

Case Study 1: Host Availability & Weekly Schedule Manager

Traceability: WF-01-HOST → MK-01-HOST-HIFI → /booking-host
Approved by Tech Lead
STAGE 1: WIREFRAME BLUEPRINT (WF-01) SKELETON
[ HEADER: Logo Placeholder | Nav Links: Home, Slots, Settings | Host Avatar ]
[ SIDEBAR ] Mini Calendar
Timezone Dropdown
Stats Counter
[ WEEKLY CALENDAR GRID ]
08:00 - 09:00
09:00 - 10:00
10:00 - 11:00
[ Drag & Drop / Slot Click Trigger ]
[ FOOTER: Legal & System Timezone Synchronization ]
STAGE 2: HI-FI APPROVED MOCKUP (MK-01) SIMS TOKENS
Logo ConnectHub Host
Host: Dr. Michael
Timezone GMT+7 (Hanoi)
16 Hrs Available Slots
Weekly Availability
08:00 - 09:00
09:00 - 10:00
Booked Slot

Case Study 2: Guest Appointment Booking & Conflict Prevention Modal

Traceability: WF-02-GUEST → MK-02-GUEST-HIFI → /booking-guest
Approved by Tech Lead
STAGE 1: WIREFRAME BLUEPRINT (WF-02) SKELETON
[ MODAL OVERLAY: Dimmed Backdrop (Opacity 0.5) ]
[ MODAL TITLE: Confirm Appointment Slot ]
[ Label: Selected Slot Time: 10:00 - 10:30 UTC ]
[ INPUT FIELD: Guest Full Name * ]
[ INPUT FIELD: Guest Email Address * ]
[ INPUT FIELD: Note / Agenda Topics ]
[ Cancel ] [ Confirm & Lock Slot ]
STAGE 2: HI-FI APPROVED MOCKUP (MK-02) SIMS TOKENS

Confirm Appointment

Slot Reserved
Thursday, Oct 15, 2026 • 10:00 - 10:30 (GMT+7)

Screen-by-Screen Traceability & Approval Matrix

Screen / Module Wireframe Ref Mockup Ref WCAG 2.1 AA Review Gate Sign-off Status Live Implemented Route
1. Host Availability Setup WF-01-HOST MK-01-HOST-HIFI Passed 2026-10-01 APPROVED /booking-host
2. Guest Appointment Booking WF-02-GUEST MK-02-GUEST-HIFI Passed 2026-10-01 APPROVED /booking-guest
3. Video Meeting Room (WebRTC SFU) WF-03-ROOM MK-03-ROOM-HIFI Passed 2026-10-02 APPROVED / (Instant Meeting)
4. SIMS Management Dashboard WF-04-DASH MK-04-DASH-HIFI Passed 2026-10-02 APPROVED /dashboard
5. Email Template Editor WF-05-EMAIL MK-05-EMAIL-HIFI Passed 2026-10-02 APPROVED /email-template-editor
6. About & Platform Architecture WF-06-ABOUT MK-06-ABOUT-HIFI Passed 2026-10-03 APPROVED /about
Verified & Signed Off

Official Design Approval & Development Sign-Off Certificate

This certificate confirms that all user interfaces for the ConnectHub SIMS Platform have successfully passed the required Stage 1 (Lo-Fi Wireframe) and Stage 2 (Hi-Fi Mockup) reviews. The designs satisfy all brand identity constraints, WCAG 2.1 AA accessibility ratios (≥ 4.5:1), and zero double-booking workflow requirements prior to frontend code commit and deployment.

Tech Lead Reviewer Nguyen Quang Huy Status: Sign-off Confirmed (2026-10-03)
Frontend Architecture Lead Huynh Tuan Khang Implementation Verified (2026-10-03)
Governance Standard ISO/IEC 25010 & WCAG 2.1 AA Audit Record: docs/design-workflow-wireframe-mockup.md